

Chemical industry
Chemical industry
In the chemical industry, Amerplastics supplies innovative plastic piping systems specially designed to withstand corrosive substances, high pressure or extreme temperatures. Our products are a sustainable alternative to traditional materials such as steel. We design solutions for, for example, cooling and fire-extinguishing water systems that meet high reliability and mechanical strength requirements.
What we are working on
What we are working on
Sustainability and performance: Amerplastics develops plastic piping systems that are resistant to the most aggressive chemicals and acids, making them extremely suitable for demanding chemical and industrial environments. Our solutions increase the reliability of your processes and reduce maintenance costs, resulting in a longer service life and a more efficient use of resources.
Innovative solutions: With our GRE (glass fibre reinforced epoxy) pipes, we provide sustainable and cost-effective solutions for the industrial and chemical sectors. Plastic pipes are lighter in weight, easy to install, and require less maintenance than traditional steel and stainless steel pipes. This leads not only to lower operational costs, but also to a lower environmental impact, contributing to the sustainability of the project.
An indispensable link
An indispensable link
In the industrial and chemical sectors, reliable joints are essential for safety. Amerplastics offers a wide range of joining techniques and resins specifically designed for the tough conditions in this sector. Our GRE systems are known for their chemical resistance and long service life, making them an excellent alternative to steel and stainless steel. Moreover, our products comply with the strictest international standards and certifications, meaning that reliability is guaranteed in every installation.
From engineering to assembling
From engineering to assembling
Thanks to our broad expertise, Amerplastics offers the possibility to engineer complete plastic piping systems in-house. Based on layout drawings, the plastic pipes are drawn out in detail by our draftsmen and/or work planners before being prefabricated in our plastics workshop. On-site installation is ultimately carried out by certified pipe fitters and engineers based on over 50 years of experience within our organisation.

Related projects
Related projects
Other industries
Other industries
Get in touch with Amerplastics experts
Get in touch with Amerplastics experts
